The job required injection from 2 to 3m depths. The very rear of the block required a further 1.5m as it was retained out of the ground. 4m steel columns were installed in the ground to take the weight of the additional height of 1.5m. Working closely with the earth workers, we achieved a successful… Read More »
Perth Zoning Changes
In 2013, the Western Australian Planning Commission (WAPC) released a new version of the Residential Design Codes, otherwise known as R-Codes. These codes provide a framework for controlling population and development density. The most interesting change for property developers, is the lowering of average and minimum lot sizes. This presents exciting new opportunities for property… Read More »
National Projects – Curtin University – Sub Station
CURTIN UNIVERSITY – SUB STATION This job had its challenges due to it being a tight site, as it was surrounded by 2 & 3 story buildings. A 3m depth injection with the top 500mm having to be excavated prior to injection due to too much crushed limestone base in the area. Our engineers designed… Read More »
