Bentley – Curtin University Focus Building

Focus Building

Curtin University

The project located on the Curtin University site was and underpinning job for the new Earth Quake test facility. The job was spread over a 3-month period with 120LM of injection being required.

We injected the grout underneath the neighboring footings to insure that no undermining upon excavation. With injection depths ranging from 1m to 2.5m, the sand had no body and would not stand alone. A good successful injection was achieved.

 

CHEMICAL GROUT INJECTION REQUIRED

120LM with varied depths.